<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>The Line on SAUDI VISION 2030 Intelligence Platform</title><link>https://vision2030.ai/tags/the-line/</link><description>Recent content in The Line on SAUDI VISION 2030 Intelligence Platform</description><generator>Hugo</generator><language>en</language><lastBuildDate>Tue, 26 May 2026 00:00:00 +0000</lastBuildDate><atom:link href="https://vision2030.ai/tags/the-line/feed.xml" rel="self" type="application/rss+xml"/><item><title>The Line Saudi Arabia Progress, Cost, and Reality Check 2026</title><link>https://vision2030.ai/analysis/the-line-progress-cost-reality-check-2026/</link><pubDate>Tue, 26 May 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/analysis/the-line-progress-cost-reality-check-2026/</guid><description>&lt;p>The Line in Saudi Arabia is not a completed city in 2026. It is NEOM&amp;rsquo;s planned linear city: officially 170 kilometers long, 200 meters wide, 500 meters high, car-free, powered by renewable energy, and intended eventually to house 9 million people [S1], [S2]. The reality check is narrower: The Line remains a first-phase construction, design, financing, and governance problem. Official sources confirm enabling works, piles, concrete capacity, design partners, and NEOM-wide infrastructure. Reporting and 2026 statements point to reprioritization, a softer 2030 deadline, and a much shorter expected initial delivery [S6], [S7], [S8], [S9].&lt;/p></description></item><item><title>NEOM Company: Inside the Corporate Vehicle Building Saudi Arabia's $500B Giga-Project</title><link>https://vision2030.ai/institutions/neom-company/</link><pubDate>Wed, 06 May 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/institutions/neom-company/</guid><description>&lt;p>&lt;strong>NEOM Company Profile: Mandate and Role.&lt;/strong> NEOM Company is the corporate vehicle developing what was, on paper, the most ambitious urban-development programme ever attempted: a $500 billion megaregion on Saudi Arabia&amp;rsquo;s Red Sea coast. The legal entity is a closed joint-stock company (شركة مساهمة مقفلة) wholly owned by the &lt;a href="https://vision2030.ai/institutions/pif/">Public Investment Fund&lt;/a>, Saudi Arabia&amp;rsquo;s roughly $925 billion sovereign wealth fund. It was incorporated by Council of Ministers decree in January 2019, more than a year after Crown Prince Mohammed bin Salman first unveiled the &lt;a href="https://vision2030.ai/encyclopedia/neom/">NEOM concept&lt;/a> at the October 2017 Future Investment Initiative. The corporate entity matters because it is distinct from the giga-project as a brand: NEOM Company is the balance sheet, the governance structure, the procurement counterparty, and the employer of record. It is also the entity whose internal audits, capex run-rate, and CEO rotations have made global front pages since 2024.&lt;/p></description></item><item><title>NEOM: Saudi Arabia's $500 Billion Giga-Project, Scope Cuts, and What's Actually Being Built</title><link>https://vision2030.ai/encyclopedia/neom/</link><pubDate>Wed, 06 May 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/encyclopedia/neom/</guid><description>&lt;h2 id="neom-saudi-arabias-giga-project-reality-check-2026">NEOM: Saudi Arabia&amp;rsquo;s Giga-Project Reality Check 2026&lt;/h2>
&lt;p>NEOM is the most ambitious — and most contested — giga-project in Saudi Arabia&amp;rsquo;s &lt;a href="https://vision2030.ai/encyclopedia/vision-2030/">Vision 2030&lt;/a> portfolio. Announced by Crown Prince Mohammed bin Salman at the inaugural Future Investment Initiative in October 2017 with a USD 500 billion price tag, NEOM was pitched as a cross-sector economic zone the size of Belgium, built from scratch on Saudi Arabia&amp;rsquo;s northwestern coast. The concept bundled a 170-kilometre linear city, a floating industrial port, a desert ski resort, luxury islands, and a coastal lifestyle corridor under a single corporate umbrella owned by the &lt;a href="https://vision2030.ai/institutions/pif/">Public Investment Fund&lt;/a>.&lt;/p></description></item><item><title>The Line: Saudi Arabia's 170km Linear City — Original Vision and 2026 Scope Cuts</title><link>https://vision2030.ai/encyclopedia/the-line/</link><pubDate>Wed, 06 May 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/encyclopedia/the-line/</guid><description>&lt;h2 id="the-line-saudi-arabia">The Line Saudi Arabia&lt;/h2>
&lt;p>The Line Saudi Arabia is the most architecturally radical and most heavily marketed component of &lt;a href="https://vision2030.ai/encyclopedia/neom/">NEOM&lt;/a>, the $500-billion-plus giga-project anchoring Saudi Arabia&amp;rsquo;s &lt;a href="https://vision2030.ai/encyclopedia/vision-2030/">Vision 2030&lt;/a> economic transformation. As originally unveiled by Crown Prince Mohammed bin Salman on 10 January 2021, The Line was to be a single linear city stretching 170 kilometres across the northwestern Tabuk desert from the Gulf of Aqaba inland — a continuous structure 500 metres tall, 200 metres wide, sheathed in mirrored glass, populated by nine million residents, free of cars, streets and carbon emissions, traversed end-to-end by a high-speed underground rail line in twenty minutes. It was, in MBS&amp;rsquo;s own framing, &amp;ldquo;a civilizational revolution that puts humans first.&amp;rdquo;&lt;/p></description></item><item><title>The Graveyard of Giga-Projects: A Forensic Audit of Every Vision 2030 Project That Failed, Flopped, or Quietly Died</title><link>https://vision2030.ai/analysis/graveyard-giga-projects/</link><pubDate>Sun, 05 Apr 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/analysis/graveyard-giga-projects/</guid><description>&lt;h2 id="vision-2030-failed-projects-the-line-mukaab-trojena">Vision 2030 Failed Projects: The Line, Mukaab, Trojena&lt;/h2>
&lt;p>This audit tracks the &lt;a href="https://vision2030.ai/encyclopedia/vision-2030/">Vision 2030&lt;/a> projects that were cancelled, suspended, scaled back, or quietly stripped of their original thesis, from The Line and the Mukaab to Trojena, Oxagon, and Jeddah Tower. The pattern is visible only when the entire giga-project portfolio is examined at once: projects with standalone economics survived, while projects dependent on the integrated megacity thesis broke first.&lt;/p>
&lt;p>What follows is the forensic record of what the Kingdom built, what it abandoned, what it spent, and what it has left to show for the most expensive construction programme in modern history.&lt;/p></description></item><item><title>The Line: $20.8 Billion Per Kilometre of Foundation Trench</title><link>https://vision2030.ai/analysis/the-line-cost-per-kilometre/</link><pubDate>Sun, 05 Apr 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/analysis/the-line-cost-per-kilometre/</guid><description>&lt;h2 id="the-line-neom-50b-spent-24km-built-88t-to-complete">The Line NEOM: $50B Spent, 2.4km Built, $8.8T to Complete&lt;/h2>
&lt;p>The Line NEOM cost case rests on three numbers: more than $50 billion spent, 2.4 kilometres of foundation work built, and an internal audit projecting $8.8 trillion and 2080 to complete the original 170-kilometre city. That equals $20.8 billion per kilometre of foundation trench, recasting &lt;a href="https://vision2030.ai/encyclopedia/neom/">NEOM&lt;/a> and &lt;a href="https://vision2030.ai/encyclopedia/the-line/">The Line&lt;/a> from an urban-design promise into a delivery and capital-allocation test.&lt;/p>
&lt;p>The number is not an approximation. It is $50 billion divided by 2.4 kilometres. It is the cost of what exists. It is the most expensive per-kilometre construction cost in the history of human infrastructure — exceeding the Channel Tunnel ($13.6 billion for 50.5 kilometres, or $269 million per kilometre at current values), the Three Gorges Dam ($37 billion for a 2.3-kilometre dam, or $16 billion per kilometre), and Dubai&amp;rsquo;s Palm Jumeirah ($12 billion for the full artificial island). The Line costs more per kilometre than any of these projects cost in total.&lt;/p></description></item><item><title>NEOM Dismembered: $6.85 Billion in Contracts Terminated in a Single Month</title><link>https://vision2030.ai/analysis/neom-dismembered/</link><pubDate>Sat, 04 Apr 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/analysis/neom-dismembered/</guid><description>&lt;p>NEOM contract cancellations in March 2026 terminated three major packages with a combined value of approximately $6.85 billion. Webuild, Italy&amp;rsquo;s largest engineering group, announced that &lt;a href="https://vision2030.ai/encyclopedia/neom/">NEOM&lt;/a> had terminated its $4.7 billion contract for three dams and a 2.8-kilometre freshwater lake at Trojena. The project had reached 30 per cent completion. Hyundai Engineering and Construction of South Korea confirmed that NEOM had terminated its tunnel construction package, awarded in June 2022 for a 12.5-kilometre section. Malaysia&amp;rsquo;s Eversendai Corporation reported the cancellation of its structural steel and fireproofing works for Trojena&amp;rsquo;s Ski Village resort.&lt;/p></description></item><item><title>NEOM Latest Developments</title><link>https://vision2030.ai/encyclopedia/neom-latest-news/</link><pubDate>Sun, 22 Feb 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/encyclopedia/neom-latest-news/</guid><description>&lt;h2 id="neom-latest-developments-2025-progress-on-the-kingdoms-flagship-project">NEOM Latest Developments 2025: Progress on the Kingdom&amp;rsquo;s Flagship Project&lt;/h2>
&lt;p>&lt;a href="https://vision2030.ai/encyclopedia/neom/">NEOM&lt;/a>, Saudi Arabia&amp;rsquo;s USD 500 billion flagship giga-project, continues to advance across its multiple development components along the Kingdom&amp;rsquo;s northwestern Red Sea coast. As the most ambitious urban development programme in modern history, NEOM generates sustained international attention for its scale, technological vision, and the practical challenges of transforming a 26,500-square-kilometre zone into a new model for human habitation and economic activity under &lt;a href="https://vision2030.ai/vision/">Vision 2030&lt;/a>.&lt;/p></description></item><item><title>NEOM Mega-City Project</title><link>https://vision2030.ai/vision/programmes/neom/</link><pubDate>Sun, 22 Feb 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/vision/programmes/neom/</guid><description>&lt;p>NEOM is Saudi Arabia&amp;rsquo;s flagship mega-city project under Vision 2030, combining The Line, Oxagon, Trojena, and Sindalah across a vast development zone in Tabuk Province. This guide explains the project&amp;rsquo;s strategic logic, $500 billion scale, delivery realities, and execution risks.&lt;/p>
&lt;h2 id="the-vision-behind-neomencyclopedianeom">The Vision Behind &lt;a href="https://vision2030.ai/encyclopedia/neom/">NEOM&lt;/a>&lt;/h2>
&lt;p>NEOM stands as the most ambitious and most scrutinised giga-project within Saudi Arabia&amp;rsquo;s &lt;a href="https://vision2030.ai/encyclopedia/vision-2030/">Vision 2030&lt;/a> portfolio. Announced in October 2017 by Crown Prince Mohammed bin Salman, NEOM is conceived as a cognitive city spanning approximately 26,500 square kilometres of northwest Saudi Arabia in Tabuk Province, stretching along the Red Sea coast and extending into mountainous terrain that rises over 2,500 metres above sea level. The project carries an estimated investment commitment exceeding $500 billion, making it one of the largest planned urban developments in human history.&lt;/p></description></item><item><title>NEOM: Technical Feasibility and Financial Viability</title><link>https://vision2030.ai/analysis/neom-feasibility/</link><pubDate>Sun, 22 Feb 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/analysis/neom-feasibility/</guid><description>&lt;h2 id="neom-feasibility-saudi-arabia-vision-2030-analysis">NEOM Feasibility: Saudi Arabia Vision 2030 Analysis&lt;/h2>
&lt;p>This NEOM feasibility analysis asks what Saudi Arabia&amp;rsquo;s flagship &lt;a href="https://vision2030.ai/encyclopedia/vision-2030/">Vision 2030&lt;/a> project can technically and financially deliver. Announced in 2017 with a $500 billion budget and a mandate to create a new model for human civilisation, &lt;a href="https://vision2030.ai/encyclopedia/neom/">NEOM&lt;/a> has become both a symbol of Saudi ambition and a test case for &lt;a href="https://vision2030.ai/analysis/vision-2030-assessment/">Vision 2030&amp;rsquo;s feasibility&lt;/a>. The project&amp;rsquo;s centrepiece, &lt;a href="https://vision2030.ai/encyclopedia/the-line/">The Line&lt;/a>, is a 170-kilometre mirrored linear city designed to house 9 million residents with zero cars, zero streets, and zero carbon emissions, pushing the boundaries of plausible urban development.&lt;/p></description></item></channel></rss>