<?xml version="1.0" encoding="utf-8" standalone="yes"?><rss version="2.0" xmlns:atom="http://www.w3.org/2005/Atom"><channel><title>Contract-Termination on SAUDI VISION 2030 Intelligence Platform</title><link>https://vision2030.ai/tags/contract-termination/</link><description>Recent content in Contract-Termination on SAUDI VISION 2030 Intelligence Platform</description><generator>Hugo</generator><language>en</language><lastBuildDate>Sat, 18 Apr 2026 00:00:00 +0000</lastBuildDate><atom:link href="https://vision2030.ai/tags/contract-termination/feed.xml" rel="self" type="application/rss+xml"/><item><title>Trojena: $6.85 Billion Cancelled in a Single Month</title><link>https://vision2030.ai/analysis/trojena-cancelled/</link><pubDate>Sun, 05 Apr 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/analysis/trojena-cancelled/</guid><description>&lt;p>In the first week of March 2026, three contractor disclosures landed in sequence. Each used the careful, liability-conscious language of publicly listed companies describing events that, in plainer English, meant they had been fired. Webuild, Italy&amp;rsquo;s largest engineering group, announced that &lt;a href="https://vision2030.ai/encyclopedia/neom/">NEOM&lt;/a> had terminated its $4.7 billion contract for three dams and a 2.8-kilometre freshwater lake at Trojena. The project had reached 30 per cent completion. Hyundai Engineering and Construction confirmed that NEOM had terminated its tunnel construction package, originally awarded in June 2022 for a $1 billion, 12.5-kilometre section. Eversendai Corporation of Malaysia reported the cancellation of its structural steel and fireproofing works for Trojena&amp;rsquo;s Ski Village resort.&lt;/p></description></item><item><title>NEOM Dismembered: $6.85 Billion in Contracts Terminated in a Single Month</title><link>https://vision2030.ai/analysis/neom-dismembered/</link><pubDate>Sat, 04 Apr 2026 00:00:00 +0000</pubDate><guid>https://vision2030.ai/analysis/neom-dismembered/</guid><description>&lt;p>NEOM contract cancellations in March 2026 terminated three major packages with a combined value of approximately $6.85 billion. Webuild, Italy&amp;rsquo;s largest engineering group, announced that &lt;a href="https://vision2030.ai/encyclopedia/neom/">NEOM&lt;/a> had terminated its $4.7 billion contract for three dams and a 2.8-kilometre freshwater lake at Trojena. The project had reached 30 per cent completion. Hyundai Engineering and Construction of South Korea confirmed that NEOM had terminated its tunnel construction package, awarded in June 2022 for a 12.5-kilometre section. Malaysia&amp;rsquo;s Eversendai Corporation reported the cancellation of its structural steel and fireproofing works for Trojena&amp;rsquo;s Ski Village resort.&lt;/p></description></item></channel></rss>